Now You Know Complete Mathematics of Cotton Spinning
Tuesday, 15 May 2018
Edit
Complete Mathematics of Spinning or Spinning Problems
Lefayet Sultan Lipol
B.Sc in Textile Technology (BUTEX), M.Sc in Textile Engineering (Sweden)
Assistant Professor & Head, Fareast International University
E-mail: lefayetbd@gmail.com
B.Sc in Textile Technology (BUTEX), M.Sc in Textile Engineering (Sweden)
Assistant Professor & Head, Fareast International University
E-mail: lefayetbd@gmail.com
![]() |
1. Find the number of lap per hour in Scutcher m/c of Bottom Calendar Roller dia = 7 inch, rpm = 12, efficiency = 80%, lap length 40 yards
Answer:
𝜋∗7∗12∗80∗60
Production of m/c = -------------------------------------- yds/hr
36∗100
= 351.85 yds/hr
351.85
No. of lap = ------------------
40
= 8.79 ≈ 9
2. Calculate the Production/hour of Blow room line with 2 Scutchers if B.C.R. dia=7 inch, r.p.m= 10, Efficiency=90%, waste 4%, lap weight 14 oz/yd. (B.C.R= Bottom Calendar Roller)
Answer:
3.14∗7∗10∗60∗90∗(100−4)∗2∗14
Production = ----------------------------------------------------------- lbs/hr
36∗16∗100∗100
= 553.896 lbs/hr
3. Calculate production/hour of a Blow Room line if, r.p.m of B.C.R r.p.m = 14, Dia= 18 cm, lap hank= 0.0012, efficiency 80%, no. of Scutcher =2
Answer:
3.14∗18∗14∗60∗0.80∗2
Production = -------------------------------------------------- lbs/hr
36∗2.546∗840∗0.0012
= 822.2 lbs/hr
4. Find out the beats/inch from the following data- Beater r.p.m= 720. No. of striker= 16, Feed roller r.p.m= 24, Dia of feed roller= 3 inch.
Answer:
Beats/min = Beater r.p.m* no. of striker
= 720*16
= 11520 no. of strikes
Surface speed of feed roller = πDN
= 3.14*3*24
= 226.08
11520
Beats/inch = -----------------
226.08
= 50.96
Solutions from Draw Frame to Auto Coner
5. Write the abbreviations:
- TPI
- TM
- CV
- RPM
- MPM
- GPS
- TPM
Elaboration:
TPI = Twist per inch
TM = Twist Multiplier
C.V = Co-efficient of variation
RPM = Revolution per minute
MPM = Meter per minute
GPS = Grams per spindle
TPM = Twist per metre
6. Delivery speed=150 MPM, Sliver hank=0.12, Tension draft =1.25 efficiency= 90%, what is the carding production/8 hrs?
Answer:
Here,
Delivery speed = 150 MPM
Sliver hank = 0.12
Tension draft = 1.25
Efficiency = 90%
150∗1.09∗60∗8∗0.90∗1.25
Production/8hrs or shift = ----------------------------------------------------------- Kg/shift
0.12∗840∗2.204
= 397.4 Kg/shift
7. Front roller speed = 3500 r.p.m, roller dia=2.5 inch, delivery hank=0.12, efficiency=90%. What is the Draw Frame production/shift/machine?
Answer:
Surface speed = π *RPM*Roller dia
= 3.14*3500*2.5"
= 27475 inch/min
27475∗60∗8∗0.90
Production/shift/m/c (8 hrs) = ------------------------------------------------- Kg/shift
36∗840∗0.12∗2.2046
= 1483 Kg/shift
8. Feed Hank=0.1, Delivery hank=0.12, Doubling=8, what is the total draft?
Answer:
Delivery hank∗Doubling
Total draft = ------------------------------------------
Feed Hank
0.12∗8
= --------------
0.1
= 9.6
9. Spindle speed=1200 r.p.m, Roving hank=0.90, TPI=1.25, efficiency=80%, no. of spindles=120, what is the production/shift/machine?
Answer:
1200∗60∗8∗120∗0.80
Production/m/c/shift = ----------------------------------------------- Kg/shift
36∗840∗0.9∗1.25∗2.2046
= 737 Kg/shift
10. Spindle speed=12500, count=30/1 Ne, TM-3.70, Efficiency=92%, 1200 spindle/frame, what is the production/frame/shift?
Answer:
TM = 3.7, Ne = 30
TPI = TM * √Ne
= 3.7*√30
= 20.26
RPM = 12500
12500∗60∗8∗1200∗0.92
Production/m/c/shift = ----------------------------------------------- Kg/shift
36∗840∗30∗20.26∗2.2046
= 163 Kg/shift
11. Roving hank=0.90, count=26/1, what is the Ring Frame total draft required?
Answer:
Required draft = Delivery hank/Feed hank
26
= ------
0.90
= 28.88 ≈ 29
12. Roving hank=0.80, yarn count 20/1, roving make how many yard?
Answer:
20
Length of yarn = -------- yards
0.8
= 25 yards
13. What are the equipments require in quality control department in a standard spinning mills?
Answer:
AFIS, USTER tester, HVI, Wrap reel, Wrap block, Balance, Strength tester, TPI tester etc.
14. Drum speed=1500 MPM, no. of head (Drum) = 60, count=30/1 Ne, efficiency= 85%, what is the Auto Cone production/machine/shift?
Answer:
1500∗60∗8∗0.85∗60∗0.9144
Production/m/c/shift = ---------------------------------------------------- Kg/shift
30∗840∗2.2046
= 604 Kg/shift.
15. Find out the production/day/comber in tons from the following parameters: Nips/min: 350, Feed/Nip= 7.5 mm, Head: 8, Noil extraction: 18%, Lap weight: 1200 grains/yd and efficiency: 85%.
Answer:
Nips/min = 350
7.5
Feed/Nip = 7.5 mm = ---------------- yd = 0.0082 yd (36"=1 yard, 2.54 cm=1", 10 mm=1 cm).
2.54∗10∗36
1200
Lap weight = 1200 grains/yd = -------------- lb/yd = 0.17 lb/yd (1 lb=7000 grains)
7000
Head = 8
Noil extraction = 18%
Efficiency = 85% = 0.85
Production/day/chamber =?
Nips Feed (100−noil)
Production = Feed lap weight * ---------- * ---------- * No. of head*time * ------------ efficiency%
min Nip 100
= 0.17*350*0.0082*8*60*24*0.82*0.85
≈ 3917 lb/day
≈ 1777 Kg/day
≈ 1.777 ton/day
Spin plan
16. Problem: Per day required production of a spinning mill is 30 ton of 32 Ne carded yarn, make a spin plan.
Solution:
1 ton =1000 Kg
30 ton = 30*1000 = 30,000 Kg
Machine required:
1. Blow room, 2. Carding, 3. Draw Frame-I, 4. Draw Frame-II, 5. Roving Frame/ Flyer Frame/ Simplex, 6. Ring Frame, 7. Auto Coner.
No. of Automatic Cone Winding machine:
Winding speed (delivery speed) = 1500-2000 m/min
No. of head (Drum) = 60
Efficiency = 85-95%
No. of winding machine =?
Yarn count = 32 Ne
Time = 1 Day = 24 hours
1500∗1.09∗60∗60∗24∗0.85∗1
Production of automatic cone winding machine = ------------------------------------------- (1m=1.09 yards)
32∗840∗2.204
= 2026.8 Kg/day/m/c
No. of Auto Coner required = 30,000/2026.8 = 14.8 ≈15
No. of Ring Frame Required:
Spindle speed = 15000-25000 rpm
No. of spindle = 480-1000
TM = 3.5-4.8
Count = 32Ne
Efficiency = 85-95%
Wastage = 0.5-1.5%
So, the production of Ring Frame should be = 30,000+30,000*1.5%
= 30,450 Kg
Spindle RPM
Delivery speed = ----------------------
TPI
Spindle RPM
= -----------------------------
TM √Count
15,000
= -------------------
4.2√32
= 631.35 inch/min
631.35∗60∗24∗1∗1000∗0.9
Production = ------------------------------------------
32∗840∗36∗2.204
![](file:///C:/Users/msi/AppData/Local/Temp/msohtmlclip1/01/clip_image002.gif)
= 383.7 Kg/day
No. of Ring Frame required = 30450/383.7
= 79.4 ≈ 80
No. of Simplex Machine Required:
Spindle speed = 900-1200 rpm
No. of spindle = 120
Roving count = 0.7-2 hank
TM = 0.9-1.3
Efficiency = 85-90%
Waste = 0.5%
Required production = 30,450+30,450*0.5%
= 30,602 Kg/day
Spindle speed
Delivery speed = ------------------------
TPI
Spindle speed
= -----------------------------
TM √Count
1200
= -------------------
1.1√1.2
= 995.85 inch/min
995.85∗1∗0.85∗60∗24∗120
Production/day/machine = ------------------------------------------------
840∗36∗1.2∗2.204
= 1836 Kg/day
No. of Simplex required = 30602/1836 ≈ 17
No. of Draw Frame-I & Draw Frame-II required:
Delivery speed = 600-800 m/min
Sliver hank = 0.12-0.2 hank
Efficiency = 90-95%
Waste = 0.5%
Time= 1 day= 24 hours
Required production of Draw Frame-I = 30602+30602*0.5%
= 30755 Kg/day
700∗1.09∗60∗24∗0.95
Production/day/m/c = ----------------------------------------
0.16∗840∗2.204
= 3524 Kg/day
No. of Draw Frame-I = 30,755/3524
= 8.7 ≈ 9
Similarly, no. of Draw Frame-II
![](file:///C:/Users/msi/AppData/Local/Temp/msohtmlclip1/01/clip_image004.gif)
No. of Carding Machine Required:
Production/Carding m/c = 30-70 Kg/hr
Waste = 4-5%
Required Carding machine = 30,755+30755*4%
= 31985 Kg/day
Carding machine production/day = 60*24 = 1440 Kg/day
No. of Carding machine required = 31985/1440
≈ 22
No. of Blow Room Line Required:
Production = 800 Kg/hr
Waste = (3-5) %
Required Blow room production = 31985 + 31985*3%
= 32945 Kg/day
Per day production/Blow room line = 800*24 Kg/day = 19200 Kg/day
No. of Blow room line required = 32945/19200 ≈ 2
So the calculated spin plan for the 30 ton/day production of 32 Ne carded yarn is:
Blow room line = 2
Carding machine = 22
Draw Frame-I = 9
Draw Frame-II = 9
Simplex = 17
Ring Frame = 80
Auto Coner = 15