Yaa Delineate Of Piece Of Job Residue As Well As Bottleneck Inwards Garments Production Delineate Of Piece Of Job

Line Balance as well as Bottleneck inwards Garments Production Line
Joyankar Mojumder
Executive-IE
Paddocks Jeans Ltd.
DEPZ, Savar, Dhaka.
Mob: 01813171408
Email: mozumderjoy@yahoo.com



Line balance: 
Line balance way the meliorate resources allotment of the necessary tasks betwixt the operators, which reduces waiting time.
Line Balance as well as Bottleneck inwards Garments Production Line  Yaa Line Balance as well as Bottleneck inwards Garments Production Line

For draw of piece of job ease nosotros get got to know to a greater extent than or less information as well as to a greater extent than or less calculating information those are every bit follows: -
  1. How many operators.
  2. Operation.
  3. SMV.
  4. Performance.
  5. Potential production / hour.
  6. Hours to accomplish target.
  7. Capacity.
  8. Target.
                                                60
Potential production / hour: --------- x Wanted efficiency
                                              SMV

                                            Target/Week
Hours to accomplish target: ------------------------------
                                        Potential Production

If SMV = 1.22
Performance = 80%
Target / Week = 2655

                                                            60
Then, Potential Production / Hour = ----------- X 80% = 39 pieces/hour
                                                          1.22

We know the target/week = 2655 pieces

                                            2655
Hours to accomplish target = ------------ = 68 hrs
                                              39

So Capacity is 60-68 = -8 hrs.

The upper narrow part of a bottle is called cervix (opening side) as well as it is an obstacle to choke to the way from large part of a bottle through narrow part of a neck. It is a metaphorical scene of obstacle of production sector. H5N1 garments sector is a production sector as well as the bottleneck used hither every bit obstacle of normal production. In a brief the bottleneck way lost production as well as lost net turn a profit i.e. the lowest capacity of production.

Bottleneck inwards the production line:
The lowest output indicate inwards the production draw of piece of job is called bottleneck. That is bottleneck area, where provide gathered as well as production goes nether capacity.
Bottleneck
Why arises bottleneck?
There are as well as then many reasons to arise a bottleneck inwards the production draw of piece of job as well as it is described below.

A) Bottleneck earlier input inwards line.
  1. If upshot is non supplied inwards fourth dimension from M.C.D as well as sub store.
  2. If upshot comes delay.
  3. Issues series number mistake.
  4. Bundling mistake.
  5. Wrong upshot supply.
  6. Pattern problem. Etc
B) Bottleneck inwards line:
  1. Worker alternative wrong.
  2. Wrong works stream / sequence of works.
  3. Non-balance resources allotment of elements.
  4. Works negligence past times workers.
  5. Workers absenteeism.
  6. Machine disturbances / out of order.
  7. Lack of supply.
  8. Non-serial supplies forrad from workers.
  9. Color shading
  10. Quality problem.
  11. If anybody becomes sick.
Diagnostic graphic symbol of bottleneck:
  • By checking counter machine: - After specific menstruation (time to time) past times checking counter machine it is slowly to disclose out the bottleneck which counter is shown pathetic / lowest production. 
  • By observing series number of supplied issue: - After checking to a greater extent than or less operators if it is works life that mortal is sewing / working lowest series number of upshot as well as it non reasonable departure alongside others it is defined bottleneck. 
  • By observing gathered supply: - Those areas are bottleneck areas where pile of provide is observed. 
  • By performing cycle check: - By performing cycle banking corporation check nosotros tin dismiss realize bottleneck from dissimilar of time. We tin dismiss realize bottleneck at a glance past times making graph as well as it is a best as well as scientific way to disclose out the existent bottleneck.
Way of reducing bottle neck: -
  1. To adapt pre- production coming together inwards time.
  2. To produce layout canvas earlier input inwards the line.
  3. To banking corporation check fabrics as well as accessories earlier issuing inwards the line.
  4. To submit the layout canvas to maintenance department minimum 2-3 days earlier for meliorate preparation.
  5. To banking corporation check designing earlier provide inwards the line.
  6. To trim down excess works from workers.
  7. To select correct workers for correct works.
  8. To proceed provide available inwards time.
  9. To hold series number.
  10. Reject garments should non forward.
  11. Supply should hold upwards forwarded later on checking.
  12. To alarm when bundling (maintain series number)
  13. By improving method.
  14. By improving workers performance.
  15. By reducing sewing outburst