Now You Know How to Calculate the Overall Machine Efficiency of Apparel Industries

How to Calculate the Overall Equipment/Machine Efficiency (OEE) of Garments Industries
Joyankar Mojumder
Inspector
Modern Testing Services (BD) Ltd.
280, East Narshinghpur, Ashulia, Savar, Dhaka.
Email: mozumderjoy@yahoo.com




What is Overall Equipment/Machine Efficiency (OEE):
 
OEE is the framework for measuring the efficiency and effectiveness of a process, by breaking it down into three constituent components (Availability, Performance and Quality product rate). It helps to measure a problem so that easily can fix it and provides a standardized method of benchmarking progress. OEE identifies the percentage of planned production time that is truly productive.
OEE  is the framework for measuring the efficiency and effectiveness of a  process Now You Know How to Calculate the Overall Machine Efficiency of Apparel Industries

Overall machine or equipment efficiency is the how to performs machine versus spec. In practically,

OEE= Availability X Performance Rate X Quality Product Rate


Where,

                      Loading time – Down time
Availability = ………………………………………. X 100
                              Loading time


                         Standard cycle time x Processing quantity
Performance = …………………………………………………. x 100
                                              Operating time


                                     Processing quantity – Defective quantity
Quality product rate = ……………………………………………………………. X 100
                                                   Processing quantity

Let,
  • Working hours per day: 10 hours x 60 min = 600 min
  • Shut down (SD): 35 min
  • Loading time: (600-35) = 565 min
  • Equipment stoppage/ down time: (30+20+25) = 75
(a) Failure : 30 min
(b) Set up : 20 min
(c) Adjustment : 25 min

  • Operating time : (565 - 75) = 490 min
  • Standard Cycle time : 0.35 min/ pieces
  • Processing quantity : 550 pieces/ day
  • Defective : 30 pieces.
Now,

                       Loading time – Down time
Availability = ……………………………………………. X 100
                               Loading time

    565 – 75
= ………………….. x 100
       565

= 86.72%

                         Standard cycle time x Processing quantity
Performance = ………………………………………………….. x 100
                                           Operating time

    0.35 x 550
= ……………………. X 100
        490

= 40.35%

                                      Processing quantity – Defective quantity
Quality product rate = ……………………………………………………………………. X 100
                                                 Processing quantity

   550 – 30
= …………….. x 100
     550

= 94.54%

So, OEE = Availability X Performance Rate X Quality Product Rate

= 0.8672 X 0.4035 X 0.9454

= 33.08%

Low Machine efficiency rate due to man:

  1. Management Losses;
  2. Motion Losses;
  3. Adjustment Losses;
  4. Losses resulting from lack of automation and
  5. Monitoring Losses

More articles of this writer:
  1. Industrial Engineering Formulas for Textile Students and Professionals
  2. Line Balance and Bottleneck in Garments Production Line
  3. Introductory of Inspection in Garments Industries

Sumber http://textilelearner.blogspot.com

Iklan Atas Artikel

Iklan Tengah Artikel 1

Iklan Tengah Artikel 2

Iklan Bawah Artikel